ITAC Assessment: GT0135
ITAC logo
ITAC Assessment: GT0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product TOILET SEATS
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 188
Plant Area
n/a
Annual Production 1,750,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,613 4,036,929
kWh
Natural Gas $144,656 32,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,552 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2443: Re-use or recycle hot or cold process exhaust air $14,899 $39,200 $(-1,781.0)
(-38,980)
kWh
$16,680
-
MMBtu
02 2.2711: Utilize outside air instead of conditioned air for drying $2,580 $3,250 $(-776.0)
(-16,999)
kWh
$3,356
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,558 $100 $5,558
121,630
kWh
-
04 2.4133: Use most efficient type of electric motors $2,471 $1,577 $2,471
54,220
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,473 $333 $1,473
32,239
kWh
-
06 2.2122: Install / repair insulation on condensate lines $1,131 $600 - $1,131
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $440 $250 $440
9,672
kWh
-
TOTAL RECOMMENDED $28,552 $45,310 $7,385
161,782
kWh
$21,167
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs