Assessment Year | 2022 |
---|---|
Principal Product | Cleaning uniforms, mats, and bulk products |
NAICS | 812332: Industrial Launderers |
SIC | 7218: Industrial Launderers |
Sales Range | $50 M to 100M |
# of Employees | 230 |
Plant Area |
50,000
ft2
|
Annual Production | 20,800,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $101,851 | 1,570,400 |
kWh
|
$0.065 | |
Electricity Demand | $75,080 | 4,513 |
kW-mo/yr
|
$16.64 | |
Electricity Fees | $17,040 | - |
|
- | |
Natural Gas | $218,841 | 25,126 |
MMBtu
|
$8.71 | |
Waste Disposal Costs | |||||
Water Usage | $121,155 | 24,568 |
Tgal
|
$4.93 | |
Water Disposal | $294,555 | 24,568 |
Tgal
|
$11.99 | |
TOTAL YEARLY COSTS | $828,522 | ||||
RECOMMENDED SAVINGS* | $112,226 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.4116: Meter recycled water (to reduce sewer charges) | $58,911 | $10,000 | - | - | - | - | $58,911 | - | |
02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $24,436 | $109,567 |
$31,225
481,120
kWh
|
$16,174
-
kW-mo/yr
|
$(-18,152.0)
-
MMBtu
|
$(-4,811.0) | - | - | |
03 | 2.9114: Use solar heat to make electricty | $12,034 | $44,013 |
$12,034
185,142
kWh
|
- | - | - | - | - | |
04 | 2.7229: Air condition only space necessary | $5,133 | $6,000 |
$1,989
30,654
kWh
|
- |
$3,144
-
MMBtu
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,821 | $4,500 |
$3,821
58,874
kWh
|
- | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,419 | $2,740 |
$2,419
37,273
kWh
|
- | - | - | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,188 | $560 |
$2,058
31,716
kWh
|
- |
$130
-
MMBtu
|
- | - | - | |
08 | 2.2511: Insulate bare equipment | $1,876 | $2,748 | - | - |
$1,876
-
MMBtu
|
- | - | - | |
09 | 3.6192: Use a less expensive method of waste removal | $1,000 | $25 | - | - | - | - | - | $1,000 | |
10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $408 | $63 |
$408
6,290
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $112,226 | $180,216 |
$53,954
831,069
kWh
|
$16,174
-
kW-mo/yr
|
$(-13,002.0)
-
MMBtu
|
$(-4,811.0) | $58,911 | $1,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||