*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Cleaning uniforms, mats, and bulk products
NAICS 812332: Industrial Launderers
SIC 7218: Industrial Launderers
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 50,000
ft2
Annual Production 20,800,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,851 1,570,400
kWh
Electricity Demand $75,080 4,513
kW-mo/yr
Electricity Fees $17,040 -
Natural Gas $218,841 25,126
MMBtu
Waste Disposal Costs
Water Usage $121,155 24,568
Tgal
Water Disposal $294,555 24,568
Tgal
TOTAL YEARLY COSTS $828,522
RECOMMENDED SAVINGS* $112,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.4116: Meter recycled water (to reduce sewer charges) $58,911 $10,000 - - - - $58,911 -
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $24,436 $109,567 $31,225
481,120
kWh
$16,174
-
kW-mo/yr
$(-18,152.0)
-
MMBtu
$(-4,811.0) - -
03 2.9114: Use solar heat to make electricty $12,034 $44,013 $12,034
185,142
kWh
- - - - -
04 2.7229: Air condition only space necessary $5,133 $6,000 $1,989
30,654
kWh
- $3,144
-
MMBtu
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,821 $4,500 $3,821
58,874
kWh
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,419 $2,740 $2,419
37,273
kWh
- - - - -
07 2.6212: Turn off equipment during breaks, reduce operating time $2,188 $560 $2,058
31,716
kWh
- $130
-
MMBtu
- - -
08 2.2511: Insulate bare equipment $1,876 $2,748 - - $1,876
-
MMBtu
- - -
09 3.6192: Use a less expensive method of waste removal $1,000 $25 - - - - - $1,000
10 2.4231: Reduce the pressure of compressed air to the minimum required $408 $63 $408
6,290
kWh
- - - - -
TOTAL RECOMMENDED $112,226 $180,216 $53,954
831,069
kWh
$16,174
-
kW-mo/yr
$(-13,002.0)
-
MMBtu
$(-4,811.0) $58,911 $1,000
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs