ITAC Assessment: UD0382
ITAC logo
ITAC Assessment: UD0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product EYEGLASSES
NAICS
n/a
SIC 3851: Ophthalmic Goods
Sales Range $5
M
to 10
M
# of Employees 92
Plant Area
n/a
Annual Production 120,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,261 322,392
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,352

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,352 $4,895 $2,352
31,360
kWh
-
02 2.7261: Install timers and/or thermostats $177 - - $177
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $542 $1,000 $542
-
kWh
-
04 2.6242: Minimize operation of equipment maintained in standby condition $578 - $578
-
kWh
-
TOTAL RECOMMENDED $3,649 $5,895 $3,472
31,360
kWh
$177
-
MMBtu
TOTAL IMPLEMENTED $2,352 $4,895 $2,352
31,360
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs