ITAC Assessment: TN0532
ITAC logo
ITAC Assessment: TN0532
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Residential interior wooden doors
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 78,000
ft2
Annual Production 1,100,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,531 533,705
kWh
Natural Gas $12,309 2,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $189,045 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $121,441

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $5,297 $17,400 - $5,297
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,314 $490 $2,314
41,325
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $952 $300 $952
16,999
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $624 $440 $624
11,137
kWh
- -
05 2.6218: Turn off equipment when not in use $261 - $261
4,689
kWh
- -
06 3.1182: Make a new by-product $118,866 $206,400 - - $118,866
-
lb
07 3.1162: Use less wasteful packaging $35,354 $65,000 - - $35,354
-
lb
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $14,584 $13,200 - - $14,584
-
lb
09 3.1191: Change procedures / equipment / operating conditions $5,860 - - - $5,860
-
lb
10 3.5315: Lease / purchase baler; sell cardboard to recycler $4,933 $8,480 - - $4,933
-
lb
TOTAL RECOMMENDED $189,045 $311,710 $4,151
74,150
kWh
$5,297
-
MMBtu
$179,597
-
lb
TOTAL IMPLEMENTED $121,441 $206,890 $2,575
46,014
kWh
- $118,866
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs