ITAC Assessment: UD0917
ITAC logo
ITAC Assessment: UD0917
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Recycled Plastics
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 60,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,731 3,155,250
kWh
Electricity Demand $51,012 5,880
kW-mo/yr
Natural Gas $4,138 349
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,376 - $9,368
133,786
kWh
$1,008
-
kW-mo/yr
- - -
02 2.5123: Reduce fluid flow rates $3,671 - - - $1,736
-
Tgal
- $1,935
-
Tgal
03 3.4115: Recover and reuse cooling water $3,388 - $(-3,203.0)
(-45,744)
kWh
$(-345.0)
-
kW-mo/yr
$3,280
-
Tgal
- $3,656
-
Tgal
04 2.7142: Utilize higher efficiency lamps and/or ballasts $35,576 $13,517 $30,339
433,290
kWh
$3,265
-
kW-mo/yr
- $1,972 -
05 2.2223: Enhance sensitivity of temperature control and cutoff $14,607 $30,000 $13,188
188,340
kWh
$1,419
-
kW-mo/yr
- - -
06 2.2511: Insulate bare equipment $6,046 $6,000 $5,459
77,964
kWh
$587
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $73,664 $49,517 $55,151
787,636
kWh
$5,934
-
kW-mo/yr
$5,016
-
Tgal
$1,972 $5,591
-
Tgal
TOTAL IMPLEMENTED $49,340 $13,517 $36,504
521,332
kWh
$3,928
-
kW-mo/yr
$3,280
-
Tgal
$1,972 $3,656
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs