Assessment Year | 2024 |
---|---|
Principal Product | Rivets, Nuts and Bolts |
NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
267,000
ft2
|
Annual Production | 1,224
units
|
Production Hrs. Annual | 5,304
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,175,586 | 11,057,298 |
kWh
|
$0.11 |
Electricity Demand | $842,026 | 21,924 |
kW-mo/yr
|
$38.41 |
Electricity Fees | $162,325 | - |
|
- |
Natural Gas | $155,677 | 22,095 |
MMBtu
|
$7.05 |
TOTAL YEARLY COSTS | $2,335,614 | |||
RECOMMENDED SAVINGS* | $964,634 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,500 | $750 |
$14,500
136,409
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,387 | $5,929 |
$6,941
65,299
kWh
|
$3,446
-
kW-mo/yr
|
- | |
03 | 2.9114: Use solar heat to make electricty | $466,298 | $706,336 |
$189,746
1,785,000
kWh
|
$276,552
-
kW-mo/yr
|
- | |
04 | 2.3141: Use battery storage for demand control | $344,818 | - |
$(-23,918.0)
(-225,000)
kWh
|
$368,736
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,235 | $2,159 |
$2,688
25,284
kWh
|
$1,547
-
kW-mo/yr
|
- | |
06 | 2.4223: Install direct acting units in place of compressed air pressure system in safety system | $26,607 | $61,000 |
$26,607
250,303
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $4,358 | $3,000 |
$1,591
14,965
kWh
|
$2,767
-
kW-mo/yr
|
- | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,755 | $18,170 |
$7,441
70,000
kWh
|
$4,314
-
kW-mo/yr
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,688 | $70,199 |
$9,012
84,784
kWh
|
$15,676
-
kW-mo/yr
|
- | |
10 | 2.1221: Replace obsolete burners with more efficient ones | $14,883 | $5,765 | - | - |
$14,883
-
MMBtu
|
|
11 | 2.3134: Shift from daytime to nighttime operation | $42,105 | - | - |
$42,105
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $964,634 | $873,308 |
$234,608
2,207,044
kWh
|
$715,143
-
kW-mo/yr
|
$14,883
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs