ITAC Assessment: MI0478
ITAC logo
ITAC Assessment: MI0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Maritime Systems
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 152,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 3,276
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,112 1,315,260
kWh
Electricity Demand $48,888 3,375
kW-mo/yr
Electricity Fees $24,152 -
TOTAL YEARLY COSTS $155,152
RECOMMENDED SAVINGS* $51,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,889 - - $4,889
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $27,548 $480 $14,845
239,434
kWh
$12,703
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $14,074 $2,600 $14,074
227,007
kWh
-
04 2.3191: Use demand controller or load shedder $4,519 $18,392 - $4,519
-
kW-mo/yr
TOTAL RECOMMENDED $51,030 $21,472 $28,919
466,441
kWh
$22,111
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs