Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

168,656

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS0326 #01 Y:2026 Reduce space conditioning during non-working hours $5,549 $175
UD1133 #09 Y:2026 Install occupancy sensors $205 $218
UD1133 #08 Y:2026 Use hot process fluids to preheat incoming process fluids $7,222 $2,552
UD1133 #07 Y:2026 Turn off equipment during breaks, reduce operating time $9,566 -
UD1133 #06 Y:2026 Install motor voltage controller on lightly loaded motors $15,204 $8,166
UD1133 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $18,109 $953
UD1133 #04 Y:2026 Install compressor air intakes in coolest locations $23,389 $4,800
UD1133 #03 Y:2026 Recover mechanical energy $53,790 $13,165
UD1133 #02 Y:2026 Install vinyl strip / high speed / air curtain doors $4,175 $1,260
UD1133 #01 Y:2026 Keep doors and windows shut when not on use $3,167 -
MUCM36 #10 Y:2026 Install occupancy sensors $134 $344
MUCM36 #09 Y:2026 Use proper thickness of insulation on building envelope $136 $254
MUCM36 #08 Y:2026 Use most efficient type of electric motors $156 $805
MUCM36 #07 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $377 $1,633
MUCM36 #06 Y:2026 Utilize sensors controlling roof and wall openings $578 $349
MUCM36 #05 Y:2026 Utilize higher efficiency lamps and/or ballasts $582 $1,672
MUCM36 #04 Y:2026 Reduce space conditioning during non-working hours $715 $1,128
MUCM36 #03 Y:2026 Replace boiler $5,317 $29,813
MUCM36 #02 Y:2026 Lower temperature during the winter season and vice-versa $6,408 -
MUCM36 #01 Y:2026 Use solar heat to make electricty $25,241 $220,400