ITAC Assessment: UD1134
ITAC logo
ITAC Assessment: UD1134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Welded metal rings and flash butt
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 250,000
ft2
Annual Production 8,220,940
units
Production Hrs. Annual 2,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,011 1,573,968
kWh
Electricity Demand $18,008 6,367
kW-mo/yr
Electricity Fees $7,612 -
Natural Gas $266,781 51,229
MMBtu
Waste Disposal Costs
Water Usage $6,105 1,213
Tgal
Water Disposal $21,362 1,213
Tgal
Other Liquid (non-haz) $15,199 1
gal
TOTAL YEARLY COSTS $495,078
RECOMMENDED SAVINGS* $39,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $15,174 $7,053 $15,174
149,200
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,216 $5,253 $3,701
36,387
kWh
$515
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,613 $953 $1,416
13,925
kWh
$197
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $3,493 $3,900 - - $3,493
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $14,966 $24,590 - - $14,966
-
MMBtu
06 2.4231: Reduce the pressure of compressed air to the minimum required $485 $513 $485
4,277
kWh
- -
TOTAL RECOMMENDED $39,947 $42,262 $20,776
203,789
kWh
$712
-
kW-mo/yr
$18,459
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs