Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

167,328

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0607 #07 Y:2025 Preheat combustion air with waste heat $4,764 $10,000
LE0607 #06 Y:2025 Repair or replace steam traps $3,892 $4,700
LE0607 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $24,953 $13,000
LE0607 #04 Y:2025 Upgrade obsolete equipment $833,198 $400,000
LE0607 #03 Y:2025 Re-arrange equipment layout to reduce handling costs $1,005,000 $300,000
LE0607 #02 Y:2025 Use / purchase optimum sized compressor $138,699 $35,000
LE0607 #01 Y:2025 Reduce the pressure of compressed air to the minimum required $2,048 -
MZ0390 #08 Y:2025 Use or replace with energy efficient substitutes $2,878 $1,700
MZ0390 #07 Y:2025 Install occupancy sensors $196 $725
MZ0390 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $3,595 $1,000
MZ0390 #05 Y:2025 Use waste heat from hot flue gases to preheat incoming fluids $11,755 $46,600
MZ0390 #04 Y:2025 Analyze flue gas for proper air/fuel ratio $7,996 $1,600
MZ0390 #03 Y:2025 Chill water to the highest temperature possible $9,218 $13,460
MZ0390 #02 Y:2025 Chill water to the highest temperature possible $8,616 $19,492
MZ0390 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $23,516 $17,100
UL2517 #06 Y:2025 Recover waste heat from equipment $14,073 $37,025
UL2517 #05 Y:2025 Use insulation in furnaces to facilitate heating / cooling $1,315 $6,435
UL2517 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,834 $1,680
UL2517 #03 Y:2025 Install occupancy sensors $152 $312
UL2517 #02 Y:2025 Reduce illumination to minimum necessary levels $430 -