ITAC Assessment: LS2601
ITAC logo
ITAC Assessment: LS2601
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Ships
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 210
Plant Area 157,496
ft2
Annual Production 15
units
Production Hrs. Annual 2,860
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $226,134 2,289,412
kWh
Electricity Demand $28,551 9,517
kW-mo/yr
TOTAL YEARLY COSTS $254,685
RECOMMENDED SAVINGS* $34,308 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $11,021 $25 $11,021
111,325
kWh
-
02 2.7211: Clean and maintain refrigerant condensers and towers $4,213 $415 $4,213
42,555
kWh
-
03 2.8117: Install sub-metering equipment $6,800 $3,750 $6,800
68,682
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,269 $2,238 $2,014
20,340
kWh
$255
-
kW-mo/yr
05 2.4224: Upgrade controls on compressors $2,666 $12,500 $2,666
26,930
kWh
-
06 2.7232: Replace existing hvac unit with high efficiency model $680 $3,830 $680
6,864
kWh
-
07 2.4226: Use / purchase optimum sized compressor $6,659 $43,000 $6,659
67,259
kWh
-
TOTAL RECOMMENDED $34,308 $65,758 $34,053
343,955
kWh
$255
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs