| Assessment Year | 2025 |
|---|---|
| Principal Product | Cameras |
| NAICS | 334413: Semiconductor and Related Device Manufacturing |
| SIC | 3674: Semiconductors and Related Devices |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
90,000
ft2
|
| Annual Production | 100
pieces
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $430,811 | 3,822,142 |
kWh
|
$0.11 |
| Natural Gas | $67,190 | 7,757 |
MMBtu
|
$8.66 |
| TOTAL YEARLY COSTS | $498,001 | |||
| RECOMMENDED SAVINGS* | $63,604 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $18,401 | - |
$14,599
129,194
kWh
|
$3,802
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,615 | - |
$2,615
23,150
kWh
|
- | |
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $12,478 | $2,000 |
$10,798
95,554
kWh
|
$1,680
-
MMBtu
|
|
| 04 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $22,734 | $28,902 |
$22,734
201,230
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,376 | $17,707 |
$7,376
65,275
kWh
|
- | |
| TOTAL RECOMMENDED | $63,604 | $48,609 |
$58,122
514,403
kWh
|
$5,482
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs