ITAC Assessment: LE0603
ITAC logo
ITAC Assessment: LE0603
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Cameras
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 90,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 2,340
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $430,811 3,822,142
kWh
Natural Gas $67,190 7,757
MMBtu
TOTAL YEARLY COSTS $498,001
RECOMMENDED SAVINGS* $63,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $18,401 - $14,599
129,194
kWh
$3,802
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,615 - $2,615
23,150
kWh
-
03 2.6231: Utilize controls to operate equipment only when needed $12,478 $2,000 $10,798
95,554
kWh
$1,680
-
MMBtu
04 2.2614: Use cooling tower or economizer to replace chiller cooling $22,734 $28,902 $22,734
201,230
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $7,376 $17,707 $7,376
65,275
kWh
-
TOTAL RECOMMENDED $63,604 $48,609 $58,122
514,403
kWh
$5,482
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs