ITAC Assessment: TN0323
ITAC logo
ITAC Assessment: TN0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ELECTRICAL HEATING ELEMENTS
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area
n/a
Annual Production 40,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $209,285 3,529,895
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,203 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7111: Reduce illumination to minimum necessary levels $11,914 - $11,914
201,934
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,487 $520 $7,487
126,905
kWh
03 2.4221: Install compressor air intakes in coolest locations $1,055 $1,200 $1,055
17,878
kWh
04 2.4312: Improve lubrication practices $747 - $747
12,603
kWh
TOTAL RECOMMENDED $21,203 $1,720 $21,203
359,320
kWh
TOTAL IMPLEMENTED $20,456 $1,720 $20,456
346,717
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs