ITAC Assessment: MI0472
ITAC logo
ITAC Assessment: MI0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Roof Sealants
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 2952: Asphalt Felts and Coatings
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 50,000
ft2
Annual Production 420,000
units
Production Hrs. Annual 4,675
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $310,137 1,323,960
kWh
Electricity Demand $56,025 7,112
kW-mo/yr
Electricity Fees $818 -
TOTAL YEARLY COSTS $366,980
RECOMMENDED SAVINGS* $9,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $4,456 $200 $4,021
17,185
kWh
$435
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $4,311 $1,606 $4,018
17,169
kWh
$293
-
kW-mo/yr
03 2.7444: Close holes and openings in building such as broken windows $66 $50 $57
244
kWh
$9
-
kW-mo/yr
04 2.7134: Use photocell controls $229 $392 $197
842
kWh
$32
-
kW-mo/yr
05 2.7135: Install occupancy sensors $269 $483 $269
1,151
kWh
-
06 2.4133: Use most efficient type of electric motors $525 $1,254 $483
2,065
kWh
$42
-
kW-mo/yr
TOTAL RECOMMENDED $9,856 $3,985 $9,045
38,656
kWh
$811
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs