ITAC Assessment: WM0257
ITAC logo
ITAC Assessment: WM0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product EDM, Grinding, and CNC services
NAICS 332710: Machine Shops
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $1
M
to 5
M
# of Employees 26
Plant Area 30,600
ft2
Annual Production 2,800
units
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,336 1,134,453
kWh
Electricity Demand $54,809 2,933
kW-mo/yr
Electricity Fees $19,063 -
Natural Gas $3,196 362
MMBtu
Waste Disposal Costs
Water Usage $3,147 204
Tgal
TOTAL YEARLY COSTS $161,551
RECOMMENDED SAVINGS* $2,717 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3132: Recharge batteries on during off-peak demand periods $245 - $245
-
kWh
-
02 2.4225: Install common header on compressors $1,825 $5,342 $1,346
18,698
kWh
$478
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $648 $5,434 $478
6,636
kWh
$170
-
kW-mo/yr
TOTAL RECOMMENDED $2,717 $10,776 $2,069
25,334
kWh
$648
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs