ITAC Assessment: MS0168
ITAC logo
ITAC Assessment: MS0168
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Foam
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 300,000
ft2
Annual Production 28,000,000
lb
Production Hrs. Annual 4,488
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,049 2,942,556
kWh
Electricity Demand $72,849 9,562
kW-mo/yr
Electricity Fees $7,986 -
Natural Gas $69,806 19,594
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $1,988 $50 - - $1,988 - - -
02 2.3212: Optimize plant power factor $1,393 $1,710 - - $1,393 - - -
03 2.7261: Install timers and/or thermostats $231 $472 $227
6,741
kWh
- $4 - - -
04 2.4221: Install compressor air intakes in coolest locations $62 $167 $34
1,172
kWh
$27
-
kW-mo/yr
$1 - - -
05 2.7224: Reduce space conditioning during non-working hours $28,070 $5,275 - - - $28,070
-
MMBtu
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,440 $2,080 $1,171
35,463
kWh
$1,435
-
kW-mo/yr
$46 $(-1,212.0)
-
MMBtu
- -
07 4.821: Pay bills on time to avoid late fees $5,437 $50 - - - - $5,437
-
Tgal
-
08 4.812: Apply for investment incentives $394 $50 - - - - - $394
TOTAL RECOMMENDED $39,015 $9,854 $1,432
43,376
kWh
$1,462
-
kW-mo/yr
$3,432 $26,858
-
MMBtu
$5,437
-
Tgal
$394
TOTAL IMPLEMENTED $1,686 $2,349 $261
7,913
kWh
$27
-
kW-mo/yr
$1,398 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs