Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,687

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS0825 #02 Y:2025 Reduce heat gain by window tinting $11,016 $2,940
LS0825 #01 Y:2025 Chill water to the highest temperature possible $8,927 $500
UW2506 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,155 $25,000
UW2506 #06 Y:2025 Install occupancy sensors $6,019 $7,709
UW2506 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,528 $15,530
UW2506 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $6,688 $54,000
UW2506 #03 Y:2025 Use solar heat to make electricty $75,836 $644,978
UW2506 #02 Y:2025 Utilize sensors controlling roof and wall openings $14,113 $1,255
UW2506 #01 Y:2025 Upgrade obsolete equipment $8,164 $187,200
SJ0036 #06 Y:2025 Reschedule plant operations or reduce load to avoid peaks $39,541 -
SJ0036 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $5,243 -
SJ0036 #04 Y:2025 Replace existing equipment with more suitable substitutes $13,688 $62,974
SJ0036 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,847 $12,868
SJ0036 #02 Y:2025 Use battery storage for demand control $7,434 $51,497
SJ0036 #01 Y:2025 Use solar heat to make electricty $74,641 $376,992
NT0045 #06 Y:2025 Begin a practice of predictive / preventative maintenance $150,000 $9,690
NT0045 #05 Y:2025 Train operators for maximum operating efficiency $150,000 $100,000
NT0045 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $65,667 $138,252
NT0045 #03 Y:2025 Lower temperature during the winter season and vice-versa $724 $950
NT0045 #02 Y:2025 Upgrade controls on compressors $13,920 $30,800