Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Aircraft Engine and Parts Manufacturing
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 104,935
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,850 843,710
kWh
Electricity Demand $7,896 1,998
kW-mo/yr
Electricity Fees $6,550 -
Natural Gas $32,578 2,749
MMBtu
Other Gas $3,617 1
MMBtu
TOTAL YEARLY COSTS $125,491
RECOMMENDED SAVINGS* $115,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4321: Upgrade obsolete equipment $8,164 $187,200 $2,882
32,496
kWh
$79
-
kW-mo/yr
$5,203
-
MMBtu
02 2.7446: Utilize sensors controlling roof and wall openings $14,113 $1,255 - - $14,113
-
MMBtu
03 2.9114: Use solar heat to make electricty $75,836 $644,978 $74,811
843,418
kWh
$1,025
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $6,688 $54,000 - - $6,688
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,528 $15,530 $2,171
24,479
kWh
$357
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $6,019 $7,709 $6,019
67,860
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,155 $25,000 $1,777
20,030
kWh
$378
-
kW-mo/yr
-
TOTAL RECOMMENDED $115,503 $935,672 $87,660
988,283
kWh
$1,839
-
kW-mo/yr
$26,004
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs