| Assessment Year | 2025 |
|---|---|
| Principal Product | Aircraft Engine and Parts Manufacturing |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 350 |
| Plant Area |
104,935
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 3,250
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $74,850 | 843,710 |
kWh
|
$0.089 |
| Electricity Demand | $7,896 | 1,998 |
kW-mo/yr
|
$3.95 |
| Electricity Fees | $6,550 | - |
|
- |
| Natural Gas | $32,578 | 2,749 |
MMBtu
|
$11.85 |
| Other Gas | $3,617 | 1 |
MMBtu
|
$3,617.00 |
| TOTAL YEARLY COSTS | $125,491 | |||
| RECOMMENDED SAVINGS* | $115,503 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $115,503 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4321: Upgrade obsolete equipment | $8,164 | $187,200 |
$2,882
32,496
kWh
|
$79
-
kW-mo/yr
|
$5,203
-
MMBtu
|
|
| 02 | 2.7446: Utilize sensors controlling roof and wall openings | $14,113 | $1,255 | - | - |
$14,113
-
MMBtu
|
|
| 03 | 2.9114: Use solar heat to make electricty | $75,836 | $644,978 |
$74,811
843,418
kWh
|
$1,025
-
kW-mo/yr
|
- | |
| 04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,688 | $54,000 | - | - |
$6,688
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,528 | $15,530 |
$2,171
24,479
kWh
|
$357
-
kW-mo/yr
|
- | |
| 06 | 2.7135: Install occupancy sensors | $6,019 | $7,709 |
$6,019
67,860
kWh
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,155 | $25,000 |
$1,777
20,030
kWh
|
$378
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $115,503 | $935,672 |
$87,660
988,283
kWh
|
$1,839
-
kW-mo/yr
|
$26,004
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $115,503 | $935,672 |
$87,660
988,283
kWh
|
$1,839
-
kW-mo/yr
|
$26,004
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs