| Assessment Year | 2025 |
|---|---|
| Principal Product | Recycled water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | less than $500 k |
| # of Employees | 5 |
| Plant Area |
218,000
ft2
|
| Annual Production | 182,500
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $237,491 | 1,493,908 |
kWh
|
$0.16 |
| Electricity Demand | $172,376 | 3,102 |
kW-mo/yr
|
$55.57 |
| Electricity Fees | $4,555 | - |
|
- |
| TOTAL YEARLY COSTS | $414,422 | |||
| RECOMMENDED SAVINGS* | $145,394 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $74,641 | $376,992 |
$55,711
350,385
kWh
|
$18,930
-
kW-mo/yr
|
- | - | |
| 02 | 2.3141: Use battery storage for demand control | $7,434 | $51,497 | - |
$7,434
-
kW-mo/yr
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,847 | $12,868 |
$2,013
12,665
kWh
|
$2,834
-
kW-mo/yr
|
- | - | |
| 04 | 4.652: Replace existing equipment with more suitable substitutes | $13,688 | $62,974 | - | - | - | $13,688 | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,243 | - |
$5,243
32,978
kWh
|
- | - | - | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $39,541 | - | - |
$23,251
-
kW-mo/yr
|
$16,290 | - | |
| TOTAL RECOMMENDED | $145,394 | $504,331 |
$62,967
396,028
kWh
|
$52,449
-
kW-mo/yr
|
$16,290 | $13,688 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs