ITAC Assessment: SJ0036
ITAC logo
ITAC Assessment: SJ0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Recycled water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 5
Plant Area 218,000
ft2
Annual Production 182,500
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,491 1,493,908
kWh
Electricity Demand $172,376 3,102
kW-mo/yr
Electricity Fees $4,555 -
TOTAL YEARLY COSTS $414,422
RECOMMENDED SAVINGS* $145,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.9114: Use solar heat to make electricty $74,641 $376,992 $55,711
350,385
kWh
$18,930
-
kW-mo/yr
- -
02 2.3141: Use battery storage for demand control $7,434 $51,497 - $7,434
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,847 $12,868 $2,013
12,665
kWh
$2,834
-
kW-mo/yr
- -
04 4.652: Replace existing equipment with more suitable substitutes $13,688 $62,974 - - - $13,688
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,243 - $5,243
32,978
kWh
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $39,541 - - $23,251
-
kW-mo/yr
$16,290 -
TOTAL RECOMMENDED $145,394 $504,331 $62,967
396,028
kWh
$52,449
-
kW-mo/yr
$16,290 $13,688
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs