ITAC Assessment: NT0045
ITAC logo
ITAC Assessment: NT0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product aggregate,ready mixed concrete,cement,Asphalt
NAICS 212319: Other Crushed and Broken Stone Mining and Quarrying
SIC 1429: Crushed and Broken Stone, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 138,830,000
ft2
Annual Production 7,500,000
ton
Production Hrs. Annual 7,260
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,242,366 36,249,600
kWh
Electricity Demand $1,041,798 110,130
kW-mo/yr
Electricity Fees $132,127 -
TOTAL YEARLY COSTS $3,416,292
RECOMMENDED SAVINGS* $386,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,253 $5,609 $4,992
80,651
kWh
$1,261
-
kW-mo/yr
- -
02 2.4224: Upgrade controls on compressors $13,920 $30,800 - - $13,920 -
03 2.7221: Lower temperature during the winter season and vice-versa $724 $950 $724
11,697
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $65,667 $138,252 $46,514
751,433
kWh
$19,153
-
kW-mo/yr
- -
05 4.431: Train operators for maximum operating efficiency $150,000 $100,000 - - - $150,000
06 4.611: Begin a practice of predictive / preventative maintenance $150,000 $9,690 - - - $150,000
TOTAL RECOMMENDED $386,564 $285,301 $52,230
843,780
kWh
$20,414
-
kW-mo/yr
$13,920 $300,000
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs