ITAC Assessment: CO0661
ITAC logo
ITAC Assessment: CO0661
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Crushed Aggregates
NAICS 327999: All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $500
k
to 1
M
# of Employees 4
Plant Area 12,930
ft2
Annual Production 507
units
Production Hrs. Annual 1,820
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,013 222,120
kWh
Electricity Demand $145,284 4,733
kW-mo/yr
Electricity Fees $1,408 -
Fuel Oil #2 $5,044 212
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $91,000 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,060

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,390 $1,000 $1,310
24,200
kWh
$25,080
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,260 $340 $750
13,800
kWh
$2,510
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,020 $2,860 $50
900
kWh
$2,970
-
kW-mo/yr
- - -
04 2.8114: Change rate schedules or other changes in utility service $52,770 $500 $4,290
-
kWh
$50,170
-
kW-mo/yr
- $(-1,690.0) -
05 2.8121: Apply for tax-free status for energy purchases $4,410 $500 - - - $4,410 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,150 $4,670 $190
3,600
kWh
$940
-
kW-mo/yr
$10 - $10
TOTAL RECOMMENDED $91,000 $9,870 $6,590
42,500
kWh
$81,670
-
kW-mo/yr
$10 $2,720 $10
TOTAL IMPLEMENTED $34,060 $1,840 $2,060
38,000
kWh
$27,590
-
kW-mo/yr
- $4,410 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs