Assessment Year | 2008 |
---|---|
Principal Product | Cutting tools |
NAICS | 333515: Cutting Tool and Machine Tool Accessory Manufacturing |
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
109,000
ft2
|
Annual Production | 2,600,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $400,563 | 8,958,750 |
kWh
|
$0.045 |
Electricity Demand | $154,483 | 18,422 |
kW-mo/yr
|
$8.39 |
Electricity Fees | $17,666 | - |
|
- |
Natural Gas | $11,684 | 918 |
MMBtu
|
$12.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,061 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $3,790 | $7,000 |
$3,790
94,848
kWh
|
- | - | - | |
02 | 3.3128: Utilize other methods to remove contaminants | $15,885 | $41,750 |
$5,638
125,559
kWh
|
$1,747
-
kW-mo/yr
|
$(-5,000.0) | $13,500 | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $3,903 | $7,500 |
$3,903
86,916
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,473 | $1,680 |
$1,125
25,056
kWh
|
$348
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,999 | $4,820 |
$1,526
33,984
kWh
|
$473
-
kW-mo/yr
|
- | - | |
06 | 2.4151: Develop a repair/replace policy | $1,686 | $2,173 |
$1,288
28,679
kWh
|
$398
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $28,736 | $64,923 |
$17,270
395,042
kWh
|
$2,966
-
kW-mo/yr
|
$(-5,000.0) | $13,500 | ||
TOTAL IMPLEMENTED | $9,061 | $16,173 |
$7,842
174,635
kWh
|
$1,219
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs