2,847
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0470 #06 Y:2018 | 06 | 2018 | Replace existing hvac unit with high efficiency model | $268,493 | $1,534,575 | |
| LE0470 #05 Y:2018 | 05 | 2018 | Utilize higher efficiency lamps and/or ballasts | $23,769 | $115,000 | |
| LE0470 #04 Y:2018 | 04 | 2018 | Use / purchase optimum sized compressor | $10,332 | $25,000 | |
| LE0470 #03 Y:2018 | 03 | 2018 | Use cooling tower or economizer to replace chiller cooling | $25,833 | $35,000 | |
| LE0470 #02 Y:2018 | 02 | 2018 | Use automatic flow control | $20,000 | $6,500 | |
| LE0470 #01 Y:2018 | 01 | 2018 | Pay utility bills on time | $4,000 | - | |
| OK1006 #06 Y:2018 | 06 | 2018 | Reduce space conditioning during non-working hours | $341 | - | |
| OK1006 #05 Y:2018 | 05 | 2018 | Clean and maintain refrigerant condensers and towers | $392 | $155 | |
| OK1006 #04 Y:2018 | 04 | 2018 | Install outside air damper / economizer on hvac unit | $262 | $1,320 | |
| OK1006 #03 Y:2018 | 03 | 2018 | Use adjustable frequency drive or multiple speed motors on existing system | $1,709 | $2,600 | |
| OK1006 #02 Y:2018 | 02 | 2018 | Utilize higher efficiency lamps and/or ballasts | $4,072 | $9,350 | |
| OK1006 #01 Y:2018 | 01 | 2018 | Optimize plant power factor | $3,856 | $17,056 | |
| IP0115 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $1,936 | $6,650 | |
| IP0115 #02 Y:2018 | 02 | 2018 | Establish a predictive maintenance program | $188 | $500 | |
| IP0115 #01 Y:2018 | 01 | 2018 | Shut off cooling if cold outside air will cool process | $1,898 | $1,950 | |
| NC0629 #08 Y:2018 | 08 | 2018 | Avoid rewinding motors more than twice | $11,808 | $25,282 | |
| NC0629 #07 Y:2018 | 07 | 2018 | Recover waste heat from equipment | $35,842 | $115,000 | |
| NC0629 #06 Y:2018 | 06 | 2018 | Install / repair insulation on steam lines | $329 | $250 | |
| NC0629 #05 Y:2018 | 05 | 2018 | Analyze flue gas for proper air/fuel ratio | $2,460 | $1,000 | |
| NC0629 #04 Y:2018 | 04 | 2018 | Reduce the pressure of compressed air to the minimum required | $8,371 | $5,000 |