ITAC Assessment: OK1006
ITAC logo
ITAC Assessment: OK1006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product purified water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 35,000
ft2
Annual Production 5,079,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,511 1,671,000
kWh
Electricity Demand $77,314 3,975
kW-mo/yr
Electricity Fees $5,891 -
Natural Gas $10,159 2,099
MMBtu
TOTAL YEARLY COSTS $161,875
RECOMMENDED SAVINGS* $10,632 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,661

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,856 $17,056 - - $3,856 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,072 $9,350 $2,847
69,440
kWh
$1,225
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,709 $2,600 $1,709
41,671
kWh
- - -
04 2.7241: Install outside air damper / economizer on hvac unit $262 $1,320 $262
6,385
kWh
- - -
05 2.7211: Clean and maintain refrigerant condensers and towers $392 $155 $120
2,923
kWh
$272
-
kW-mo/yr
- -
06 2.7224: Reduce space conditioning during non-working hours $341 - $249
6,075
kWh
- - $92
-
MMBtu
TOTAL RECOMMENDED $10,632 $30,481 $5,187
126,494
kWh
$1,497
-
kW-mo/yr
$3,856 $92
-
MMBtu
TOTAL IMPLEMENTED $8,661 $26,561 $3,216
78,438
kWh
$1,497
-
kW-mo/yr
$3,856 $92
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs