ITAC Assessment: OR0669
ITAC logo
ITAC Assessment: OR0669
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 348,480
ft2
Annual Production 6,614
units
Production Hrs. Annual 8,568
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,082 5,491,305
kWh
Electricity Demand $110,882 13,434
kW-mo/yr
Electricity Fees $48,021 -
Natural Gas $84,970 12,822
MMBtu
Waste Disposal Costs
Other Liquid (haz) $302,400 134,400
gal
TOTAL YEARLY COSTS $882,355
RECOMMENDED SAVINGS* $458,356 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7243: Improve air circulation with destratification fans / other methods $9,894 $5,100 $1,017
15,938
kWh
- $8,877
-
MMBtu
- - -
02 3.6124: Burn waste oil for heat $375,721 $189,945 - - $73,321
-
MMBtu
$302,400
-
gal
- -
03 2.6231: Utilize controls to operate equipment only when needed $39,019 $15,722 $29,956
469,604
kWh
- $9,063
-
MMBtu
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,352 $500 $1,208
18,933
kWh
$144
-
kW-mo/yr
- - - -
05 2.7135: Install occupancy sensors $4,233 $5,720 $3,181
49,866
kWh
- - - $420 $632
06 2.9114: Use solar heat to make electricty $28,137 $340,762 $28,014
439,167
kWh
$123
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $458,356 $557,749 $63,376
993,508
kWh
$267
-
kW-mo/yr
$91,261
-
MMBtu
$302,400
-
gal
$420 $632
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs