Assessment Year | 2000 |
---|---|
Principal Product | Aluminum Die Casting and Stampings |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $5 M to 10M |
# of Employees | 61 |
Plant Area |
65,000
ft2
|
Annual Production | 200,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,150 | 4,609,906 |
kWh
|
$0.044 |
Electricity Demand | $17,572 | 888 |
kW-mo/yr
|
$19.79 |
Electricity Fees | $35,335 | - |
|
- |
Natural Gas | $106,843 | 23,483 |
MMBtu
|
$4.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,910 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,223 | $4,990 |
$2,025
39,273
kWh
|
$198
-
kW-mo/yr
|
- | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,559 | $4,310 |
$2,282
44,256
kWh
|
$277
-
kW-mo/yr
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,253 | $169 |
$1,194
23,154
kWh
|
$59
-
kW-mo/yr
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,051 | - |
$952
18,464
kWh
|
$99
-
kW-mo/yr
|
- | - | - | |
05 | 3.5316: Contract a wood pallet recycling company | $3,000 | - | - | - | - |
$3,000
-
lb
|
- | |
06 | 3.6124: Burn waste oil for heat | $5,509 | $3,500 | - | - |
$5,509
-
gal
|
- | - | |
07 | 4.445: Install equipment to move product | $6,075 | $500 | - | - | - | - | $6,075 | |
08 | 4.611: Begin a practice of predictive / preventative maintenance | $1,240 | $3,700 | - | - | - | - | $1,240 | |
TOTAL RECOMMENDED | $22,910 | $17,169 |
$6,453
125,147
kWh
|
$633
-
kW-mo/yr
|
$5,509
-
gal
|
$3,000
-
lb
|
$7,315 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs