ITAC Assessment: MO0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Aluminum Die Casting and Stampings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 61
Plant Area 65,000
ft2
Annual Production 200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,150 4,609,906
kWh
Electricity Demand $17,572 888
kW-mo/yr
Electricity Fees $35,335 -
Natural Gas $106,843 23,483
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,910 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,223 $4,990 $2,025
39,273
kWh
$198
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $2,559 $4,310 $2,282
44,256
kWh
$277
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,253 $169 $1,194
23,154
kWh
$59
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,051 - $952
18,464
kWh
$99
-
kW-mo/yr
- - -
05 3.5316: Contract a wood pallet recycling company $3,000 - - - - $3,000
-
lb
-
06 3.6124: Burn waste oil for heat $5,509 $3,500 - - $5,509
-
gal
- -
07 4.445: Install equipment to move product $6,075 $500 - - - - $6,075
08 4.611: Begin a practice of predictive / preventative maintenance $1,240 $3,700 - - - - $1,240
TOTAL RECOMMENDED $22,910 $17,169 $6,453
125,147
kWh
$633
-
kW-mo/yr
$5,509
-
gal
$3,000
-
lb
$7,315
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs