ITAC Assessment: LE0180
ITAC logo
ITAC Assessment: LE0180
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Machined Metal Axles and Shafts
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 53,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,632 1,861,900
kWh
Electricity Demand $85,990 7,148
kW-mo/yr
Natural Gas $12,828 1,364
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,675 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,970

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $46,917 - - $46,917
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,802 $17,364 $5,792
78,273
kWh
$3,010
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $6,024 $2,200 $4,179
56,481
kWh
$1,845
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $1,020 $300 $708
9,566
kWh
$312
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,067 $1,200 $727
9,819
kWh
$340
-
kW-mo/yr
-
06 2.2524: Avoid cooling of process streams or materials that must subsequently be heated $942 $550 - - $942
-
MMBtu
07 2.7135: Install occupancy sensors $903 $1,350 $903
12,214
kWh
- -
TOTAL RECOMMENDED $65,675 $22,964 $12,309
166,353
kWh
$52,424
-
kW-mo/yr
$942
-
MMBtu
TOTAL IMPLEMENTED $55,970 $4,250 $5,614
75,866
kWh
$49,414
-
kW-mo/yr
$942
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs