ITAC Assessment: NC0023
ITAC logo
ITAC Assessment: NC0023
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Dry packages soups and sauces
NAICS
n/a
SIC 2034: Dried and Dehydrated Fruits, Vegetables, and Soup Mixes
Sales Range $10
M
to 50
M
# of Employees 113
Plant Area 141,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,160
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $275,116 5,539,273
kWh
Natural Gas $99,709 24,766
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $349,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3132: Recharge batteries on during off-peak demand periods $1,130 - $1,130
-
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $385 $770 $385
7,620
kWh
-
03 2.7241: Install outside air damper / economizer on hvac unit $3,610 $7,500 $3,610
134,818
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $122,824 $35,000 $86,051
1,732,122
kWh
$36,773
-
MMBtu
05 2.2437: Recover waste heat from equipment $72,336 $30,000 $14,003
281,946
kWh
$58,333
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $148,485 $65,000 $90,152
1,814,478
kWh
$58,333
-
MMBtu
07 2.2136: Install / repair insulation on steam lines $297 $97 - $297
-
MMBtu
TOTAL RECOMMENDED $349,067 $138,367 $195,331
3,970,984
kWh
$153,736
-
MMBtu
TOTAL IMPLEMENTED $385 $770 $385
7,620
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs