3,649
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UF0505 #08 Y:2016 | 08 | 2016 | Repair and eliminate steam leaks | $4,554 | $1,592 | |
| UF0505 #07 Y:2016 | 07 | 2016 | Preheat boiler makeup water with waste process heat | $7,374 | $4,000 | |
| UF0505 #06 Y:2016 | 06 | 2016 | Repair and eliminate steam leaks | $7,831 | $1,081 | |
| UF0505 #05 Y:2016 | 05 | 2016 | Install turbulators | $12,705 | $7,500 | |
| UF0505 #04 Y:2016 | 04 | 2016 | Establish a preventative maintenance program | $13,763 | $120 | |
| UF0505 #03 Y:2016 | 03 | 2016 | Increase amount of condensate returned | $18,902 | $2,800 | |
| UF0505 #02 Y:2016 | 02 | 2016 | Replace boiler | $152,736 | $200,000 | |
| UF0505 #01 Y:2016 | 01 | 2016 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $715,231 | $1,700,000 | |
| NC0587 #06 Y:2016 | 06 | 2016 | Eliminate or reduce compressed air usage | $3,022 | $1,200 | |
| NC0587 #05 Y:2016 | 05 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,666 | $500 | |
| NC0587 #04 Y:2016 | 04 | 2016 | Use cooling tower water instead of refrigeration | $62,705 | $158,000 | |
| NC0587 #03 Y:2016 | 03 | 2016 | Install occupancy sensors | $798 | $400 | |
| NC0587 #02 Y:2016 | 02 | 2016 | Reduce illumination to minimum necessary levels | $375 | $75 | |
| NC0587 #01 Y:2016 | 01 | 2016 | Utilize higher efficiency lamps and/or ballasts | $64,592 | $221,073 | |
| MZ0220 #05 Y:2016 | 05 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,522 | $1,000 | |
| MZ0220 #04 Y:2016 | 04 | 2016 | Install compressor air intakes in coolest locations | $2,435 | $1,320 | |
| MZ0220 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $3,483 | $6,643 | |
| MZ0220 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $2,030 | $11,846 | |
| MZ0220 #01 Y:2016 | 01 | 2016 | Install occupancy sensors | $2,360 | $2,860 | |
| UF0504 #06 Y:2016 | 06 | 2016 | Re-arrange equipment layout to reduce handling costs | $9,360 | $3,600 |