Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,687

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8435 #03 Y:2025 Eliminate/reduce an operation $1,199 $300
LT8435 #02 Y:2025 Turn off equipment when not in use $195 $126
LT8435 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $12,189 $17,079
MUCM32 #03 Y:2025 Install / repair insulation on steam lines $40 $147
MUCM32 #02 Y:2025 Use photocell controls $122 $893
MUCM32 #01 Y:2025 Install occupancy sensors $4,360 $360
DL0264 #05 Y:2025 Use waste heat from hot flue gases to preheat $82,928 $200,000
DL0264 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $38,350 $12,000
DL0264 #03 Y:2025 Eliminate or reduce compressed air usage $80,790 $125,000
DL0264 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $37,100 $70,000
DL0264 #01 Y:2025 Use / purchase optimum sized compressor $27,428 $165,000
MUWT08 #05 Y:2025 Install / repair insulation on steam lines $33 $120
MUWT08 #04 Y:2025 Use or replace with energy efficient substitutes $181 $1,899
MUWT08 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $107 -
MUWT08 #02 Y:2025 Lower temperature during the winter season and vice-versa $3,553 -
MUWT08 #01 Y:2025 Minimize water usage $25,065 $53,711
WV0692 #11 Y:2025 Analyze flue gas for proper air/fuel ratio $705 $1,346
WV0692 #10 Y:2025 Establish a predictive maintenance program $1,059 $3,300
WV0692 #09 Y:2025 Eliminate or reduce compressed air usage $1,281 $1,420
WV0692 #08 Y:2025 Reduce the pressure of compressed air to the minimum required $1,619 $64