ITAC Assessment: DL0264
ITAC logo
ITAC Assessment: DL0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Bottled Beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 240
Plant Area 500,000
ft2
Annual Production 198,130
Tgal
Production Hrs. Annual 7,248
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,778,807 17,570,114
kWh
Natural Gas $1,799,571 157,265
MMBtu
TOTAL YEARLY COSTS $3,578,378
RECOMMENDED SAVINGS* $266,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $27,428 $165,000 $27,428
271,560
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $37,100 $70,000 $37,100
367,340
kWh
-
03 2.4239: Eliminate or reduce compressed air usage $80,790 $125,000 $80,790
799,860
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $38,350 $12,000 $38,350
381,480
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $82,928 $200,000 - $82,928
-
MMBtu
TOTAL RECOMMENDED $266,596 $572,000 $183,668
1,820,240
kWh
$82,928
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs