Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

170,859

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1009 #07 Y:2026 Upgrade controls on compressors $4,640 $40,001
AM1009 #06 Y:2026 Install an uninteruptable power supply $145,000 $288,927
AM1009 #05 Y:2026 Reduce space conditioning during non-working hours $1,712 $105
AM1009 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $3,183 $30
AM1009 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,413 $421
AM1009 #02 Y:2026 Combine utility meters $8,665 $25,923
AM1009 #01 Y:2026 Optimize plant power factor $2,830 $2,739
UD1150 #06 Y:2026 Use waste heat from hot flue gases to preheat $2,950 $8,050
UD1150 #05 Y:2026 Install compressor air intakes in coolest locations $1,310 $2,150
UD1150 #04 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $13,680 -
UD1150 #03 Y:2026 Use flow control valves on equipment to optimize water use $9,875 $528
UD1150 #02 Y:2026 Reduce hot water temperature to the minimum required $31,563 -
UD1150 #01 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $4,844 -
LS0826 #05 Y:2026 Replace existing chiller with high efficiency model $29,676 $360,000
LS0826 #04 Y:2026 Reduce heat gain by window tinting $24,185 $177,207
LS0826 #03 Y:2026 Recover waste heat from equipment $875 $5,600
LS0826 #02 Y:2026 Utilize higher efficiency lamps and/or ballasts $24,280 $78,000
LS0826 #01 Y:2026 Install occupancy sensors $3,546 $6,890
AM1004 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $13,554 $125
AM1004 #03 Y:2026 Utilize energy-efficient belts and other improved mechanisms $160 $95