ITAC Assessment: AM1004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product High Performance Polymers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 143,500
ft2
Annual Production 100,000
lb
Production Hrs. Annual 8,520
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,305 1,966,561
kWh
Electricity Demand $47,893 4,409
kW-mo/yr
Electricity Fees $16,227 -
Natural Gas $1,633 147
MMBtu
Waste Disposal Costs
Water Usage $2,272 33,000
Tgal
TOTAL YEARLY COSTS $207,330
RECOMMENDED SAVINGS* $175,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $8,060 $19,282 - $8,060
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $153,709 $15,000 - - $38,427 $115,282
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $160 $95 $121
1,701
kWh
$39
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $13,554 $125 $11,150
157,048
kWh
$2,404
-
kW-mo/yr
- -
TOTAL RECOMMENDED $175,483 $34,502 $11,271
158,749
kWh
$10,503
-
kW-mo/yr
$38,427 $115,282
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs