ITAC Assessment: SD0345
ITAC logo
ITAC Assessment: SD0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product plastics bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $1
M
to 5
M
# of Employees 77
Plant Area 150,000
ft2
Annual Production 36,000,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $839,696 8,447,039
kWh
Electricity Demand $179,025 13,845
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $287,649 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,986

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $24,904 $560 $21,067
211,948
kWh
$3,837
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,852 $16,492 $10,029
100,897
kWh
$1,823
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $8,200 $2,396 $6,936
69,778
kWh
$1,264
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $2,912 $2,360 $2,912
29,296
kWh
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,230 $1,650 $2,230
22,434
kWh
- - -
06 4.441: Install automatic packing equipment $235,176 $320,000 - - - $235,176
07 2.8123: Pay utility bills on time $2,375 - - - $2,375
-
MMBtu
-
TOTAL RECOMMENDED $287,649 $343,458 $43,174
434,353
kWh
$6,924
-
kW-mo/yr
$2,375
-
MMBtu
$235,176
TOTAL IMPLEMENTED $38,986 $18,702 $33,326
335,279
kWh
$5,660
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Energy Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs