Assessment Year | 2004 |
---|---|
Principal Product | plastics bags |
NAICS | 326111: Plastics Bag and Pouch Manufacturing |
SIC | 3081: Unsupported Plastics Film and Sheet |
Sales Range | $1 M to 5M |
# of Employees | 77 |
Plant Area |
150,000
ft2
|
Annual Production | 36,000,000
ton
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $839,696 | 8,447,039 |
kWh
|
$0.099 |
Electricity Demand | $179,025 | 13,845 |
kW-mo/yr
|
$12.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $287,649 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,986 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,904 | $560 |
$21,067
211,948
kWh
|
$3,837
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,852 | $16,492 |
$10,029
100,897
kWh
|
$1,823
-
kW-mo/yr
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $8,200 | $2,396 |
$6,936
69,778
kWh
|
$1,264
-
kW-mo/yr
|
- | - | |
04 | 2.2511: Insulate bare equipment | $2,912 | $2,360 |
$2,912
29,296
kWh
|
- | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,230 | $1,650 |
$2,230
22,434
kWh
|
- | - | - | |
06 | 4.441: Install automatic packing equipment | $235,176 | $320,000 | - | - | - | $235,176 | |
07 | 2.8123: Pay utility bills on time | $2,375 | - | - | - |
$2,375
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $287,649 | $343,458 |
$43,174
434,353
kWh
|
$6,924
-
kW-mo/yr
|
$2,375
-
MMBtu
|
$235,176 | ||
TOTAL IMPLEMENTED | $38,986 | $18,702 |
$33,326
335,279
kWh
|
$5,660
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Energy Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs