Assessment Year | 2025 |
---|---|
Principal Product | Premium Concrete Roofing Tiles |
NAICS | 327390: Other Concrete Product Manufacturing |
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 65 |
Plant Area |
33,000
ft2
|
Annual Production | 1,450,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $15,974 | 107,640 |
kWh
|
$0.15 | |
Natural Gas | $27,934 | 2,491 |
MMBtu
|
$11.21 | |
LPG | $12,975 | 441 |
MMBtu
|
$29.42 | |
Fuel Oil #1 | $119,305 | 4,672 |
MMBtu
|
$25.54 | |
Fuel Oil #2 | $51,079 | 2,022 |
MMBtu
|
$25.26 | |
Waste Disposal Costs | |||||
Water Usage | $903 | 215 |
Tgal
|
$4.20 | |
Water Disposal | $5,284 | 215 |
Tgal
|
$24.58 | |
TOTAL YEARLY COSTS | $233,454 | ||||
RECOMMENDED SAVINGS* | $23,347 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #1 Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $9,444 | $73,645 |
$9,444
95,800
kWh
|
- | - | |
02 | 2.8226: Increase efficiency of trucks | $7,008 | $32,925 |
$(-2,033.0)
(-32,765)
kWh
|
$5,526
-
MMBtu
|
$3,515
-
MMBtu
|
|
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $587 | $1,800 |
$587
3,968
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,845 | $13,786 |
$3,845
25,983
kWh
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,790 | $372 |
$1,790
12,100
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $230 | $263 |
$230
1,554
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $176 | $390 |
$176
1,190
kWh
|
- | - | |
08 | 2.7134: Use photocell controls | $267 | $267 |
$267
1,807
kWh
|
- | - | |
TOTAL RECOMMENDED | $23,347 | $123,448 |
$14,306
109,637
kWh
|
$5,526
-
MMBtu
|
$3,515
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #1 Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs