ITAC Assessment: UU0269
ITAC logo
ITAC Assessment: UU0269
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Premium Concrete Roofing Tiles
NAICS 327390: Other Concrete Product Manufacturing
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 33,000
ft2
Annual Production 1,450,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,974 107,640
kWh
Natural Gas $27,934 2,491
MMBtu
LPG $12,975 441
MMBtu
Fuel Oil #1 $119,305 4,672
MMBtu
Fuel Oil #2 $51,079 2,022
MMBtu
Waste Disposal Costs
Water Usage $903 215
Tgal
Water Disposal $5,284 215
Tgal
TOTAL YEARLY COSTS $233,454
RECOMMENDED SAVINGS* $23,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #1 Savings Fuel Oil #2 Savings
01 2.9114: Use solar heat to make electricty $9,444 $73,645 $9,444
95,800
kWh
- -
02 2.8226: Increase efficiency of trucks $7,008 $32,925 $(-2,033.0)
(-32,765)
kWh
$5,526
-
MMBtu
$3,515
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $587 $1,800 $587
3,968
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,845 $13,786 $3,845
25,983
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $372 $1,790
12,100
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $230 $263 $230
1,554
kWh
- -
07 2.7135: Install occupancy sensors $176 $390 $176
1,190
kWh
- -
08 2.7134: Use photocell controls $267 $267 $267
1,807
kWh
- -
TOTAL RECOMMENDED $23,347 $123,448 $14,306
109,637
kWh
$5,526
-
MMBtu
$3,515
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #1 Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs