Assessment Year | 2002 |
---|---|
Principal Product | Die Castings |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $1 M to 5M |
# of Employees | 187 |
Plant Area |
120,000
ft2
|
Annual Production | 120,000
lb
|
Production Hrs. Annual | 6,900
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $161,603 | 6,142,397 |
kWh
|
$0.026 |
Electricity Demand | $125,234 | 14,412 |
kW-mo/yr
|
$8.69 |
Electricity Fees | $37,519 | - |
|
- |
Natural Gas | $322,246 | 57,525 |
MMBtu
|
$5.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,940 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,289 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $16,280 | $8,000 | - | - | - |
$16,280
-
gal
|
- | |
02 | 3.3131: Use evaporation to concentrate material | $6,896 | $11,000 | n/a | - | - |
$(-2,499.0)
-
MMBtu
|
$10,725
-
gal
|
$(-1,330.0) |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,700 | - | - |
$5,700
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,213 | $11,042 |
$3,336
120,002
kWh
|
$1,877
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,052 | $150 |
$2,122
76,302
kWh
|
$930
-
kW-mo/yr
|
- | - | - | |
06 | 2.7314: Reduce ventilation air | $2,842 | $8,000 |
$1,586
57,048
kWh
|
$1,256
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $957 | $356 |
$604
21,735
kWh
|
$353
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $40,940 | $38,548 |
$7,648
275,087
kWh
|
$10,116
-
kW-mo/yr
|
$(-2,499.0)
-
MMBtu
|
$27,005
-
gal
|
$(-1,330.0) | ||
TOTAL IMPLEMENTED | $20,289 | $8,506 |
$2,726
98,037
kWh
|
$1,283
-
kW-mo/yr
|
- |
$16,280
-
gal
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs