Assessment Year | 2001 |
---|---|
Principal Product | Fabricated Metal Products |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 32 |
Plant Area |
62,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 2,168
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $20,016 | 484,181 |
kWh
|
$0.041 |
Electricity Demand | $23,639 | 1,923 |
kW-mo/yr
|
$12.29 |
Electricity Fees | $6,143 | - |
|
- |
Natural Gas | $24,851 | 2,301 |
MMBtu
|
$10.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,398 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,349 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,536 | $1,800 |
$2,159
39,979
kWh
|
$2,377
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $488 | - |
$183
3,384
kWh
|
$305
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $325 | $735 |
$132
2,443
kWh
|
$193
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.6232: Install set-back timers | $2,895 | $580 | - | - |
$2,895
-
MMBtu
|
- | - | - | |
05 | 3.1191: Change procedures / equipment / operating conditions | $3,154 | - | - | - | - |
$1,740
-
lb
|
$1,414 | - | |
06 | 4.447: Automate payroll system | $11,000 | $4,748 | - | - | - | - | $4,900 | $6,100 | |
TOTAL RECOMMENDED | $22,398 | $7,863 |
$2,474
45,806
kWh
|
$2,875
-
kW-mo/yr
|
$2,895
-
MMBtu
|
$1,740
-
lb
|
$6,314 | $6,100 | ||
TOTAL IMPLEMENTED | $5,349 | $2,535 |
$2,474
45,806
kWh
|
$2,875
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs