ITAC Assessment: OR0609
ITAC logo
ITAC Assessment: OR0609
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Freeze Dried Foods
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 385
Plant Area 207,119
ft2
Annual Production 8,453
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $926,908 20,628,000
kWh
Electricity Demand $285,246 36,656
kW-mo/yr
Electricity Fees $71,581 -
Natural Gas $386,171 85,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $324,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $117,782

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.1243: Use heat from boiler blowdown to preheat boiler feed water $13,082 $4,037 - - $13,082
-
MMBtu
- -
02 2.2511: Insulate bare equipment $4,347 $4,299 - - $4,347
-
MMBtu
- -
03 2.6218: Turn off equipment when not in use $3,555 $4,200 $3,555
75,006
kWh
- - - -
04 2.1116: Improve combustion control capability $6,499 $5,792 $4,002
84,424
kWh
- $2,497
-
MMBtu
- -
05 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $4,900 $4,480 $4,900
103,379
kWh
- - - -
06 3.4111: Use closed cycle process to minimize waste water production $142,102 $374,500 $(-7,723.0)
(-162,936)
kWh
$(-1,801.0)
-
kW-mo/yr
- $153,976
-
Tgal
$(-2,350.0)
07 2.6231: Utilize controls to operate equipment only when needed $117,782 $160,770 $117,782
2,484,792
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,018 $5,875 $4,018
84,765
kWh
- - - -
09 2.2621: Modify refrigeration system to operate at a lower pressure $28,299 $42,000 $22,947
484,108
kWh
$5,352
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $324,584 $605,953 $149,481
3,153,538
kWh
$3,551
-
kW-mo/yr
$19,926
-
MMBtu
$153,976
-
Tgal
$(-2,350.0)
TOTAL IMPLEMENTED $117,782 $160,770 $117,782
2,484,792
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs