Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product plastic extruded laminates
NAICS 326130: Laminated Plastics Plate, Sheet (except Packaging), and Shape Manufacturing
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 280,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,587,327 26,702,208
kWh
Electricity Demand $538,314 48,072
kW-mo/yr
Natural Gas $230,436 18,766
MMBtu
TOTAL YEARLY COSTS $2,356,077
RECOMMENDED SAVINGS* $1,122,359 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $3,065 $22,618 $2,664
45,148
kWh
$401
-
kW-mo/yr
-
02 2.4239: Eliminate or reduce compressed air usage $6,154 $220 $6,154
104,299
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,738 $3,090 $2,986
50,618
kWh
$810
-
kW-mo/yr
$942
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,287 $840 $2,586
43,841
kWh
$701
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,404 $14,030 $19,404
328,893
kWh
- -
06 2.7233: Use properly designed and sized hvac equipment $5,711 $1,945 $4,526
76,720
kWh
$1,185
-
kW-mo/yr
-
07 3.1182: Make a new by-product $1,080,000 $1,350,000 - - $1,080,000
TOTAL RECOMMENDED $1,122,359 $1,392,743 $38,320
649,519
kWh
$3,097
-
kW-mo/yr
$1,080,942
TOTAL IMPLEMENTED $42,359 $42,743 $38,320
649,519
kWh
$3,097
-
kW-mo/yr
$942
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings