Assessment Year | 2005 |
---|---|
Principal Product | Industrial Parts Washing Systems |
NAICS | 333517: Machine Tool Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
183,170
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $332,331 | 4,046,696 |
kWh
|
$0.082 |
Electricity Fees | $14,529 | - |
|
- |
Natural Gas | $97,228 | 13,079 |
MMBtu
|
$7.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $51,735 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $40,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8114: Change rate schedules or other changes in utility service | $21,991 | - | - | - | $21,991 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $12,033 | $750 |
$12,033
146,746
kWh
|
- | - | |
03 | 2.2447: Heat water with exhaust heat | $7,316 | $18,825 |
$385
(-4,700)
kWh
|
$6,931
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,874 | $9,682 |
$5,874
71,527
kWh
|
- | - | |
05 | 4.212: Adopt in-house material generation | $3,278 | $10,000 |
$(-24,034.0)
(-293,100)
kWh
|
- | $27,312 | |
06 | 2.7124: Make a practice of turning off lights when not needed | $915 | - |
$915
11,146
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $328 | $1,200 |
$328
3,998
kWh
|
- | - | |
TOTAL RECOMMENDED | $51,735 | $40,457 |
$(-4,499.0)
(-64,383)
kWh
|
$6,931
-
MMBtu
|
$49,303 | ||
TOTAL IMPLEMENTED | $40,813 | $10,432 |
$18,822
229,419
kWh
|
- | $21,991 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs