ITAC Assessment: UM0285
ITAC logo
ITAC Assessment: UM0285
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Industrial Parts Washing Systems
NAICS 333517: Machine Tool Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 183,170
ft2
Annual Production 150
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $332,331 4,046,696
kWh
Electricity Fees $14,529 -
Natural Gas $97,228 13,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,735 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $21,991 - - - $21,991
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,033 $750 $12,033
146,746
kWh
- -
03 2.2447: Heat water with exhaust heat $7,316 $18,825 $385
(-4,700)
kWh
$6,931
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,874 $9,682 $5,874
71,527
kWh
- -
05 4.212: Adopt in-house material generation $3,278 $10,000 $(-24,034.0)
(-293,100)
kWh
- $27,312
06 2.7124: Make a practice of turning off lights when not needed $915 - $915
11,146
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $328 $1,200 $328
3,998
kWh
- -
TOTAL RECOMMENDED $51,735 $40,457 $(-4,499.0)
(-64,383)
kWh
$6,931
-
MMBtu
$49,303
TOTAL IMPLEMENTED $40,813 $10,432 $18,822
229,419
kWh
- $21,991
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs