ITAC Assessment: OK0030
ITAC logo
ITAC Assessment: OK0030
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product FISH LOCATORS
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 371
Plant Area
n/a
Annual Production 90,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,409 2,532,239
kWh
Natural Gas $14,324 5,578
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,289 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $58 $58 $58
1,465
kWh
-
02 2.7111: Reduce illumination to minimum necessary levels $113 $273 $113
2,931
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $799 $2,600 $799
19,930
kWh
-
04 2.5194: Redesign process $2,025 $20,000 - $2,025
-
MMBtu
05 2.2511: Insulate bare equipment $30 $198 - $30
-
MMBtu
06 2.2514: Cover open tanks $264 $495 $264
7,034
kWh
-
TOTAL RECOMMENDED $3,289 $23,624 $1,234
31,360
kWh
$2,055
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs