ITAC Assessment: UD1015
ITAC logo
ITAC Assessment: UD1015
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Diary (Milk, Cheese, Sour Cream)
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 133
Plant Area 132,800
ft2
Annual Production 305,495,091
units
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,572 11,628,120
kWh
Electricity Demand $9,621 2,364
kW-mo/yr
Electricity Fees $118,007 -
Natural Gas $288,157 64,029
MMBtu
Waste Disposal Costs
Water Usage $265,384 71,928
Tgal
TOTAL YEARLY COSTS $1,413,741
RECOMMENDED SAVINGS* $124,889 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,065

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,207 - $2,946
46,756
kWh
$261
-
kW-mo/yr
- -
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $6,248 $309 $5,740
91,104
kWh
$508
-
kW-mo/yr
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,267 - - - $2,267
-
MMBtu
-
04 2.1131: Repair faulty insulation in furnaces, boilers, etc $769 $1,080 - - $769
-
MMBtu
-
05 2.2627: Use multiple-effect evaporators $18,945 $26,742 $17,405
276,269
kWh
$1,540
-
kW-mo/yr
- -
06 2.2628: Utilize a less expensive cooling method $7,958 - $6,761
107,310
kWh
$1,197
-
kW-mo/yr
- -
07 2.2696: Use excess cold process fluid for industrial cooling needs $6,591 - $4,305
68,328
kWh
$2,286
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $60,442 $86,373 $50,592
803,040
kWh
$3,847
-
kW-mo/yr
- $6,003
09 2.7142: Utilize higher efficiency lamps and/or ballasts $9,052 $1,854 $8,095
128,498
kWh
$702
-
kW-mo/yr
- $255
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,410 $28,400 $8,473
134,490
kWh
$937
-
kW-mo/yr
- -
TOTAL RECOMMENDED $124,889 $144,758 $104,317
1,655,795
kWh
$11,278
-
kW-mo/yr
$3,036
-
MMBtu
$6,258
TOTAL IMPLEMENTED $12,065 - $7,251
115,084
kWh
$2,547
-
kW-mo/yr
$2,267
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs