Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

171,104

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM1009 #07 Y:2026 Upgrade controls on compressors $4,640 $40,001
AM1009 #06 Y:2026 Install an uninteruptable power supply $145,000 $288,927
AM1009 #05 Y:2026 Reduce space conditioning during non-working hours $1,712 $105
AM1009 #04 Y:2026 Reduce the pressure of compressed air to the minimum required $3,183 $30
AM1009 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,413 $421
AM1009 #02 Y:2026 Combine utility meters $8,665 $25,923
AM1009 #01 Y:2026 Optimize plant power factor $2,830 $2,739
MI0480 #06 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,565 $4,700
MI0480 #05 Y:2026 Install occupancy sensors $599 $1,230
MI0480 #04 Y:2026 Turn off equipment when not in use $10,324 $2,600
MI0480 #03 Y:2026 Reschedule plant operations or reduce load to avoid peaks $12,231 -
MI0480 #02 Y:2026 Lower temperature during the winter season and vice-versa $4,186 -
MI0480 #01 Y:2026 Air condition only space necessary $3,979 -
MS0476 #05 Y:2026 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $302 $299
MS0476 #04 Y:2026 Install steam trap $5,571 $75,000
MS0476 #03 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $3,730 $13,068
MS0476 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,611 $2,799
MS0476 #01 Y:2026 Optimize plant power factor $20,031 $121,000
AM1000 #11 Y:2026 Reschedule plant operations or reduce load to avoid peaks $153,338 $140,400
AM1000 #10 Y:2026 Turn off equipment when not in use $21,976 $3,510