ITAC Assessment: MS0476
ITAC logo
ITAC Assessment: MS0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2027
Principal Product wire and cable
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 400,000
ft2
Annual Production 73,461,519
lb
Production Hrs. Annual 8,700
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $752,000 16,620,180
kWh
Electricity Demand $443,750 57,788
kW-mo/yr
Natural Gas $231,995 42,600
MMBtu
Waste Disposal Costs
Water Usage $27,981 6,003
Tgal
Water Disposal $47,579 6,003
Tgal
TOTAL YEARLY COSTS $1,503,305
RECOMMENDED SAVINGS* $38,245 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $20,031 $121,000 - $20,031 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,611 $2,799 $8,611
190,501
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,730 $13,068 $3,730
82,514
kWh
- -
04 2.2111: Install steam trap $5,571 $75,000 - - $5,571
-
MMBtu
05 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $302 $299 $302
6,688
kWh
- -
TOTAL RECOMMENDED $38,245 $212,166 $12,643
279,703
kWh
$20,031 $5,571
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs