Assessment Year | 2000 |
---|---|
Principal Product | Decorative Ornamental Figurines |
NAICS |
n/a
|
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
90,000
ft2
|
Annual Production | 650,000
pieces
|
Production Hrs. Annual | 2,805
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,637 | 1,033,705 |
kWh
|
$0.043 |
Electricity Demand | $66,560 | 3,333 |
kW-mo/yr
|
$19.97 |
Electricity Fees | $1,528 | - |
|
- |
Natural Gas | $9,848 | 1,272 |
MMBtu
|
$7.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $441,316 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $3,159 | $2,800 | n/a |
$3,159
22,567
kWh
|
- | - |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $402 | $15 | n/a |
$135
3,224
kWh
|
$267
-
kW-mo/yr
|
- |
03 | 2.4221: Install compressor air intakes in coolest locations | $332 | $400 | n/a |
$111
2,638
kWh
|
$221
-
kW-mo/yr
|
- |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,167 | $120 | n/a |
$1,167
9,086
kWh
|
- | - |
05 | 2.8114: Change rate schedules or other changes in utility service | $4,374 | $20,000 | n/a | - | - | $4,374 |
06 | 2.8113: Purchase gas directly from a contract gas supplier | $985 | $250 | n/a | - | - | $985 |
07 | 4.322: Eliminate old stock and modify inventory control | $7,650 | $5,000 | n/a | - | - | $7,650 |
08 | 4.321: Optimize production lot sizes and inventories | $1,912 | $5,880 | n/a | - | - | $1,912 |
09 | 4.424: Improve space comfort conditioning | $1,160 | $335 | n/a | - | - | $1,160 |
10 | 4.114: Add/modify equipment to improve drying process | $419,000 | $30,000 | n/a | - | - | $419,000 |
11 | 3.4155: Meter waste water | $1,000 | $250 | n/a | - | - | $1,000 |
12 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $175 | $500 | n/a | - | - | $175 |
TOTAL RECOMMENDED | $441,316 | $65,550 |
$4,572
37,515
kWh
|
$488
-
kW-mo/yr
|
$436,256 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs