Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

77

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Amusement and recreation services
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ORC015 #05 Y:2024 Insulate bare equipment $164 $100
ORC015 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $39 $750
ORC015 #03 Y:2024 Use computer programs to optimize hvac performance $1,053 $5,400
ORC015 #02 Y:2024 Install occupancy sensors $279 $512
ORC015 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,048 $26,865
AS0589 #05 Y:2024 Install heat pipes / raise cooling setpoint $234 $80
AS0589 #04 Y:2024 Conserve energy by efficient use of vending machines $548 $747
AS0589 #03 Y:2024 Pay bills on time to avoid late fees $1,087 $70
AS0589 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $6,677 $6,857
AS0589 #01 Y:2024 Use solar heat to make electricty $61,574 $440,495
UU0249 #04 Y:2024 Lower temperature during the winter season and vice-versa $1,737 $500
UU0249 #03 Y:2024 Improve air circulation with destratification fans / other methods $3,461 $15,246
UU0249 #02 Y:2024 Reduce space conditioning during non-working hours $4,114 $3,450
UU0249 #01 Y:2024 Change rate schedules or other changes in utility service $35,814 $1,200
MZ1001 #04 Y:2023 Lower temperature during the winter season and vice-versa $10,268 $2,010
MZ1001 #03 Y:2023 Turn off equipment during breaks, reduce operating time $904 $770
MZ1001 #02 Y:2023 Install occupancy sensors $507 $1,000
MZ1001 #01 Y:2023 Replace existing hvac unit with high efficiency model $12,758 $83,955
LS0124 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,107 $3,300
LS0124 #02 Y:2023 Level one – add communication using iiot devices to existing control system to modify operations $24,894 $59,475