ITAC Assessment: UD1155
ITAC logo
ITAC Assessment: UD1155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product community center, exercise facilities
NAICS 713940: Fitness and Recreational Sports Centers
SIC 7991: Physical Fitness Facilities
Sales Range less than $500
k
# of Employees 20
Plant Area 43,600
ft2
Annual Production 1
units
Production Hrs. Annual 5,150
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,647 902,345
kWh
Natural Gas $57,297 6,546
MMBtu
Waste Disposal Costs
Water Usage $20,500 2,000
Tgal
TOTAL YEARLY COSTS $204,444
RECOMMENDED SAVINGS* $130,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,110 $7,000 $2,110
15,033
kWh
-
02 2.7314: Reduce ventilation air $6,619 $22,000 $2,986
21,273
kWh
$3,633
-
MMBtu
03 2.7314: Reduce ventilation air $4,937 $12,000 $2,394
17,059
kWh
$2,543
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,964 $27,000 $9,964
70,991
kWh
-
05 2.9114: Use solar heat to make electricty $106,674 $900,000 $106,674
760,042
kWh
-
TOTAL RECOMMENDED $130,304 $968,000 $124,128
884,398
kWh
$6,176
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs