ITAC Assessment: MUCM43
ITAC logo
ITAC Assessment: MUCM43
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product N/A
NAICS 713940: Fitness and Recreational Sports Centers
SIC 7999: Amusement and Recreation Services, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 65,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,475
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,872 1,611,029
kWh
Electricity Demand $50,027 4,140
kW-mo/yr
Electricity Fees $28,219 -
Natural Gas $52,792 6,899
MMBtu
Waste Disposal Costs
Water Usage $37,292 2,401
Tgal
TOTAL YEARLY COSTS $268,202
RECOMMENDED SAVINGS* $1,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $733 $3,479 $169
2,724
kWh
$564
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $506 $1,334 $354
5,714
kWh
$151
-
kW-mo/yr
-
03 2.2136: Install / repair insulation on steam lines $284 $1,206 $225
3,621
kWh
$60
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $83 $204 - - $83
-
MMBtu
05 2.7134: Use photocell controls $145 $462 $97
1,567
kWh
$48
-
kW-mo/yr
-
TOTAL RECOMMENDED $1,751 $6,685 $845
13,625
kWh
$824
-
kW-mo/yr
$83
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs