253
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LT8443 #04 Y:2026 | 04 | 2026 | Use solar heat to make electricty | $283,539 | $2,113,200 |
n/a
|
| LT8443 #03 Y:2026 | 03 | 2026 | Utilize higher efficiency lamps and/or ballasts | $263 | $713 |
n/a
|
| LT8443 #02 Y:2026 | 02 | 2026 | Use or replace with energy efficient substitutes | $60,922 | $686,315 |
n/a
|
| LT8443 #01 Y:2026 | 01 | 2026 | Reduce the pressure of compressed air to the minimum required | $155 | - |
n/a
|
| OR0808 #05 Y:2025 | 05 | 2025 | Reduce the pressure of compressed air to the minimum required | $4,145 | $32,578 |
n/a
|
| OR0808 #04 Y:2025 | 04 | 2025 | Reduce illumination to minimum necessary levels | $3,076 | - |
n/a
|
| OR0808 #03 Y:2025 | 03 | 2025 | Reduce ventilation air | $6,836 | - |
n/a
|
| OR0808 #02 Y:2025 | 02 | 2025 | Use cooling tower or economizer to replace chiller cooling | $8,055 | - |
n/a
|
| OR0808 #01 Y:2025 | 01 | 2025 | Reduce ventilation air | $13,430 | - |
n/a
|
| LT8397 #04 Y:2024 | 04 | 2024 | Install occupancy sensors | $158 | $63 |
n/a
|
| LT8397 #03 Y:2024 | 03 | 2024 | Turn off equipment when not in use | $1,111 | $888 |
n/a
|
| LT8397 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $416 | $2,298 |
n/a
|
| LT8397 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $17,937 | $4,003 |
n/a
|
| LE0563 #08 Y:2024 | 08 | 2024 | Utilize higher efficiency lamps and/or ballasts | $222 | $1,600 | |
| LE0563 #07 Y:2024 | 07 | 2024 | Minimize use of outside make-up air for ventilation except when used for economizer cycle | $1,253 | $9,000 | |
| LE0563 #06 Y:2024 | 06 | 2024 | Replace existing hvac unit with high efficiency model | $6,361 | $21,000 | |
| LE0563 #05 Y:2024 | 05 | 2024 | Replace existing hvac unit with high efficiency model | $14,800 | $19,440 | |
| LE0563 #04 Y:2024 | 04 | 2024 | Re-use or recycle hot or cold process exhaust air | $5,106 | $2,500 | |
| LE0563 #03 Y:2024 | 03 | 2024 | Install occupancy sensors | $307 | $140 | |
| LE0563 #02 Y:2024 | 02 | 2024 | Install timers and/or thermostats | $2,648 | $960 |