ITAC Assessment: CI0082
ITAC logo
ITAC Assessment: CI0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Medical Equipment
NAICS 423450: Medical, Dental, and Hospital Equipment and Supplies Merchant Wholesalers
SIC 5047: Medical, Dental, and Hospital Equipment and Supplies
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 16,700
ft2
Annual Production 1
units
Production Hrs. Annual 2,496
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,476 100,661
kWh
Electricity Demand $17,536 1,026
kW-mo/yr
Electricity Fees $9,348 -
Natural Gas $1,076 44
MMBtu
LPG $1,680 43
MMBtu
TOTAL YEARLY COSTS $52,116
RECOMMENDED SAVINGS* $24,248 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,271 $5,300 $10,451
46,801
kWh
$820
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,085 $3,195 $2,255
10,101
kWh
$830
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $2,897 $1,350 $2,183
9,775
kWh
$714
-
kW-mo/yr
- -
04 2.6218: Turn off equipment when not in use $2,859 $360 $2,859
12,803
kWh
- - -
05 2.7232: Replace existing hvac unit with high efficiency model $1,818 $8,000 $1,346
6,026
kWh
$472
-
kW-mo/yr
- -
06 2.8227: Adjust / maintain fork lift trucks for most efficient operation $1,644 $12,000 $(-536.0)
(-2,400)
kWh
- $1,680
-
MMBtu
$500
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $674 $7,500 $674
3,020
kWh
- - -
TOTAL RECOMMENDED $24,248 $37,705 $19,232
86,126
kWh
$2,836
-
kW-mo/yr
$1,680
-
MMBtu
$500
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs